Application
The NUCLEAR-Racks are special solutions for battery deployment in nuclear power plants.
Special features
The design was developed in 2004 and live-tested for SL2 in a test laboratory in Sweden. Exactly 10 years later, the rack was tested again, but as a result of the Fukushima disaster with SL3 = 3.4 g!
Delivery periods
The NUCLEAR-Rack is a customized design with a delivery period of eight weeks. Please also consider planning and design periods.
Apart from DIN EN 50272, certain specifications of the customer were taken into account here.
The basic material is steel with a high-value PE which is plastic-coated by a fluid bed process in RAL 7021 black grey.